Samson DOUBLE BRAID Class II Eye Splice Modified for Turb Uživatelský manuál Strana 4

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 5
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 3
PAGE 4 OF 5
SamsonRope.com | Email [email protected] | Tel +1.360.384.4669
Double Braid Class II Eye Splice Modified for Turbo-37
SAMSON SPLICING INSTRUCTIONS
TUCKING EYE COVER BUNDLES
Next, tuck the 6 cover braid yarn bundles at the base of the eye. With the eye laying at (as shown in Fig. I) take bundle closest to the
throat of the eye (bundle #1) and pass it under core A. Take the next cover yarn bundle (#2) and pass it under core B. Take core bundle
#3 and pass it under core C.
10
step
To be tucked on other
side of rope
6
5
4
3
2
1
A
B
C
Cut ends off at angle
3 sets of tucks minimum
Tape exposed splice for the entire length
Turn rope
over
Figure I
Figure J
Turn the rope over and continue this process with the 3 remaining cover yarn bundles (Fig. J). The direction of the tucks should be
as shown. Tape around the rope at the point where the tucks occur. Repeat this procedure until a minimum of 3 tucks have been
completed. When the last set of tucks has been made and taped, cut off excess cover yarn bundles ush with the last taped section.
11
step
Slide the cover material (which was put on the rope in Step 3) up over the exposed
cores. At the eye-end of the splice, separate the strands of the cover material into 4
equal size bundles (2 on the top of the rope and 2 on the bottom.)
Top of rope
2 legs
of the eye
Slide cover material over
exposed cores
tape
FINISHING THE SPLICE
Zobrazit stránku 3
1 2 3 4 5

Komentáře k této Příručce

Žádné komentáře